Method of limiting layer fracturing

To pressure for multilayer and each layer has different rupture pressure wells. Thenumber and diameter of control of each layer perforation, and as far as possible to improve the injection rate, using the first frac sand perforation friction layer improve the bottom hole pressure and achieve a divider multilayer purpose.
A, B and C three reservoir, fracturing pressure respectively 24, 20 and 22MPa,according to the respective eyelet perforation scheme launched. When injected into the bottom hole pressure is 20 MPa, B laminated open; and then enhance the displacement, due to perforation friction is proportional to the displacement, B layerperforation friction reached 2 MPa injected into the bottom hole pressure is 22 MPa,namely the C layer is pressed; continue to improve the displacement, B layerperforation friction reaches 4MPa at the bottom of the hole injection the pressure is 24 MPa, the A layer is pressed to open. Perforation of the effect is similar to thedownhole throttling device, with a Ceramic proppants displacement increase, the bottom hole pressurecontinues to improve, and then laminated open.
Limit the key flow method of layered fracturing perforating fracturing is to plan according to the requirements of reasonable design, including perforation, hole density and pore size, so that the completion and fracturing to form a unified whole.

没有评论:

发表评论