2015年4月4日星期六

Fracturing proppant rent limit and computer program selection


The ability of fracturing proppant properties and diversion in the geological and engineering conditions under given, fracturing design personnel must master the different types, different diameter proppant properties and leased limit.

  Combined with the geological conditions of a given (closure pressure, rock hardness, temperature and fracturing objective layer compound etc.), use the existing engineering conditions (nature,hydraulic fracture stimulation , fracturing fluid infusion equipment) can be safely pump, after pressing can obtain higher and stable yield of primipara proppant.

  Selection of proppant computer program including, total economic standard. The net present value calculation; hydraulic fracture stimulation , production technology and economic feasibility of the model input data, the volume and the proppant weight and other factors.


没有评论:

发表评论