Hydraulic fracturing process is usually two hours, ceramic proppant process is very short.
Hydraulic fracturing includes five steps:
1. Well and layer selection: the cost of fracturing a well is generally from 500 thousand to 1 million yuan, an oil reservoir with multi-layered general.
2. Hydraulic fracturing design
3. Preparing for Hydraulic Fracturing
4. hydraulic fracturing :
According to different wells have different design requirements can be broadly divided into the following steps:
(1). Test pressure (pressure test): wellhead equipment, ground facilities for the testing process pressure capability.
(2). Join Preflush (pad fluid water activity): The aim is broken strata, causing cracks in certain geometries, to prepare for the entry of sand-carrying fluid can also clean the wellbore surrounding impurities.
(3). Proppant solution: its role is to be ground into the fracture proppant and brought to a predetermined position of the fracture, as well as extension of crack formation in the cooling effect.
(4). Replacement fluid: The aim is to promote the sand carrying liquid, be sent to a predetermined position.
(5). Shut: According to different designs of wells, typically 4-12 hours.
5. Back row: flowback fluid is carrying sand (plant-based plastic material) is discharged back to the wellbore in order to protect the formation. In this step will need breaker.
The amount of fracturing a well ceramic, based on the calculated fracture length and width. Generally 30-40 square, large amount of up to one hundred sixty seventy square.